Explain throughput, downtime and quality through the physical events that produced the number.

OEE drops after a changeover, but the loss comes from repeated safety pauses rather than slow equipment. MAXACOR lets the team move from the KPI to the exact machines, tasks and evidence behind it. MAXACOR provides evidence-bearing operational performance; business reporting remains with its owning systems.

## When it matters

OEE drops after a changeover, but the loss comes from repeated safety pauses rather than slow equipment. MAXACOR lets the team move from the KPI to the exact machines, tasks and evidence behind it.

### data Viz

### data View

section: module-scene

### Section 1

col Title: Machine State and OEE

col Cont: A line reports high availability while repeated micro-stops destroy throughput. The KPI exposes the operational loss instead of hiding it in averages.

### Section 2

col Title: Bottlenecks and Process Evidence

col Cont: Material repeatedly queues before one shared inspection station. Teams can see the actual constraint and the cases that created it.

### Section 3

col Title: Schedule-to-Execution Variance

col Cont: The schedule says a batch is complete while one operation remains blocked. Planning receives the physical reason and the unfinished commitment.

## Shop-Floor Intelligence and Performance

data View: maxacor-shop-floor-performance:submodules

### Machine State and OEE

desc: Derive operational metrics from qualified machine state, production counts and time windows.

link: /sub-modules/maxacor-machine-state-oee

### Bottlenecks and Process Evidence

desc: Connect process paths, waits, rework and resource contention to physical events.

link: /sub-modules/maxacor-bottleneck-process-mining

### Schedule-to-Execution Variance

desc: Compare planned sequence and timing with accepted and completed physical work.

link: /sub-modules/maxacor-schedule-execution

## Machine State and OEE

action: Derive operational metrics from qualified machine state, production counts and time windows.

mechanism: A line reports high availability while repeated micro-stops destroy throughput.

workflow role: A line reports high availability while repeated micro-stops destroy throughput.

operational outcome: The KPI exposes the operational loss instead of hiding it in averages.

maturity: specified

evidence: MAXACOR Part 9, §§13–19; Part6.

### Section 1

Operations team

### Section 2

Engineering team

### Section 1

Qualified physical state

### Section 2

Current work context

### Section 1

Evidence-bearing operational disposition

### Section 1

A dashboard number cannot become final truth without its evidence.

## Bottlenecks and Process Evidence

action: Connect process paths, waits, rework and resource contention to physical events.

mechanism: Material repeatedly queues before one shared inspection station.

workflow role: Material repeatedly queues before one shared inspection station.

operational outcome: Teams can see the actual constraint and the cases that created it.

maturity: specified

evidence: MAXACOR Part 9, §§13–19; Part6.

### Section 1

Operations team

### Section 2

Engineering team

### Section 1

Qualified physical state

### Section 2

Current work context

### Section 1

Evidence-bearing operational disposition

### Section 1

Process correlation does not prove cause automatically.

## Schedule-to-Execution Variance

action: Compare planned sequence and timing with accepted and completed physical work.

mechanism: The schedule says a batch is complete while one operation remains blocked.

workflow role: The schedule says a batch is complete while one operation remains blocked.

operational outcome: Planning receives the physical reason and the unfinished commitment.

maturity: specified

evidence: MAXACOR Part 9, §§13–19; Part6.

### Section 1

Operations team

### Section 2

Engineering team

### Section 1

Qualified physical state

### Section 2

Current work context

### Section 1

Evidence-bearing operational disposition

### Section 1

MAXACOR does not own final production scheduling.

## Relationships

### products

- MAXACOR — https://babadook.tech/products/maxacor

### sub modules

- Machine State and OEE — https://babadook.tech/sub-modules/maxacor-machine-state-oee
- Bottlenecks and Process Evidence — https://babadook.tech/sub-modules/maxacor-bottleneck-process-mining
- Schedule-to-Execution Variance — https://babadook.tech/sub-modules/maxacor-schedule-execution