# Capacity and Clear-to-Build Evidence

Canonical URL: https://babadook.tech/sub-modules/maxacor-capacity-ctb
Entity: sub-modules
Content hash: 7d191d2e8c6d8d2f7c1a50a818ddd0086e421e877c256660b227a792a981002b

Combine material, equipment, tooling, workforce and route evidence around a proposed build.

Every component is available except the only qualified fixture. The missing physical dependency appears before work is released.

## What changes

Every component is available except the only qualified fixture. The missing physical dependency appears before work is released.

### data Viz

### data View

section: operating-scene

## Operational boundary

- **What it does:** Combine material, equipment, tooling, workforce and route evidence around a proposed build.
- **What the team gains:** The missing physical dependency appears before work is released.
- **What it does not own:** MAXACOR does not own the ERP clear-to-build record.
- **section:** operational-boundary

## Capacity and Clear-to-Build Evidence

action: Combine material, equipment, tooling, workforce and route evidence around a proposed build.

mechanism: Every component is available except the only qualified fixture.

workflow role: Every component is available except the only qualified fixture.

operational outcome: The missing physical dependency appears before work is released.

maturity: specified

evidence: MAXACOR Part 9, §§19.6–19.8.

### Section 1

Operations team

### Section 2

Engineering team

### Section 1

Qualified physical state

### Section 2

Current work context

### Section 1

Evidence-bearing operational disposition

### Section 1

MAXACOR does not own the ERP clear-to-build record.

## Relationships

### products

- MAXACOR — https://babadook.tech/products/maxacor

### modules

- Materials, Supplier and Production Readiness — https://babadook.tech/modules/maxacor-materials-supplier-readiness