# Physical Feasibility

Canonical URL: https://babadook.tech/sub-modules/maxacor-physical-feasibility
Entity: sub-modules
Content hash: 013e7a531c16bc09ef3e312453345ec327a3dc62f3ba131f9f3089bd11b4bd8c

Test whether the asset, environment, tooling and dependencies can perform the requested work now.

A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.

## What changes

A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.

### data Viz

### data View

section: operating-scene

## Operational boundary

- **What it does:** Test whether the asset, environment, tooling and dependencies can perform the requested work now.
- **What the team gains:** Impossible plans fail before consuming floor time or creating unsafe pressure.
- **What it does not own:** Feasibility is not authorization or execution.
- **section:** operational-boundary

## Physical Feasibility

action: Test whether the asset, environment, tooling and dependencies can perform the requested work now.

mechanism: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.

workflow role: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.

operational outcome: Impossible plans fail before consuming floor time or creating unsafe pressure.

maturity: specified

evidence: MAXACOR Part 5, §§3.3–3.11.

### Section 1

Operations team

### Section 2

Engineering team

### Section 1

Qualified physical state

### Section 2

Current work context

### Section 1

Evidence-bearing operational disposition

### Section 1

Feasibility is not authorization or execution.

## Relationships

### products

- MAXACOR — https://babadook.tech/products/maxacor

### modules

- Deterministic Safety and Control Admission — https://babadook.tech/modules/maxacor-deterministic-safety