modules

Manufacturing

Stop building the wrong revision — every order locked to released engineering.

The most expensive words on a shop floor are 'which revision are you building?' Wrong components ordered, capacity scheduled against obsolete routings, dates promised the new design cannot meet. Manufacturing ends that: one object family from release through close, so the BOM on the work order is the version engineering released and the costs are the ones finance will actually book.

Why manufacturing truth matters

Engineering releases a BOM change and manufacturing finds out weeks later — after buying the wrong components, scheduling against obsolete routings, and promising dates the new design cannot meet. XRP keeps one object family from release through close: the BOM version on the work order is the version engineering released, the routing is the one capacity planned against, and the costs are the ones finance will actually book. Work orders carry BOM snapshot, routing, operations, quality checks, labor, material moves, and cost accumulation in one object. Phantom items explode transparently, matrix BOMs resolve configurations without part-number sprawl, and contract manufacturing tracks vendor operations with the same rigor as internal ones.

data Viz

data View

section: thesis

Who answers for Manufacturing

Four roles, four anxieties, one object family answering each.

data Viz

data View

section: personas

Section 1

col Title: COO

col Cont: Throughput without the revision roulette. Capacity plans against released engineering, lines run released routings, and delivery commitments update the moment a revision lands — instead of after the wrong parts arrive.

Section 2

col Title: Plant Manager

col Cont: Work orders, BOMs, routing, costing, quality, and capacity in one object. When a machine goes down, the blast radius across production, supply, and commitments is visible immediately — not at the next meeting.

Section 3

col Title: Quality Leader

col Cont: Checks, NCRs, and corrective actions bound to the exact lot, operation, and operator. Recalls scope in one query instead of a week of spreadsheets.

Section 4

col Title: CFO

col Cont: Job costs complete at work-order close with standard-to-actual variance already calculated. No month-end reconstruction of what the floor really spent.

Manufacturing capabilities

Revision-locked orders
Work orders bind released BOM and routing snapshots with full state history
Practical shop flows
Dependency-aware operations, time capture, scrap, rework, split/merge, by-products
Genealogy built in
Serial and lot traceability from receipt through production to shipment
Quality inline
Checks, FMEA linkage, and yield analytics on the operation, not in a side system
OEE live
Availability, performance, and quality feed BI as events validate
Cost with close
Completion posts costs to finance and updates inventory in one transaction
section
capabilities

From revision chaos to one truth

subtitle: What each stage feels like after adoption.

layout: alternating

enable Slideshow: false

slideshow Interval: 5000

Orders lock to released engineering

date: Phase 1

status: in-progress

BOM and routing snapshots pin per order; wrong-revision builds stop immediately.

has Learn More: false

Planning replans on change

date: Phase 2

status: upcoming

Engineering releases propagate to MRP, capacity, and commitments the same hour.

has Learn More: false

Costs complete at close

date: Phase 3

status: upcoming

Job costs land with the work order instead of being reconstructed at month-end.

has Learn More: false

Recalls answer in one query

date: Phase 4

status: upcoming

Genealogy from receipt through production scopes any recall in seconds.

has Learn More: false

Manufacturing in daily operation

Each surface below works the same order object — planning explodes it, the floor executes it, vendors extend it, and scanners prove every move.

data Viz

data View

section: applications

Contract Manufacturing

Vendor operations tracked like internal ones: material shipments to vendors, outside processing steps, finished-goods receipts, and cost reconciliation — with vendor identity and evidence on every outside step.

Phantom and Matrix BOMs

Phantom items flatten transparently during MRP while matrix BOMs resolve configurations without part-number sprawl. Substitutions carry effectivity and approval so the floor never guesses which revision applies.

Barcode Scanning

Composite scanning validates item, lot, serial, and operation in one pass. Wrong-lot and wrong-operation scans refuse with the correct target directed, and every scan writes genealogy into the unit record.

Advanced Operations

Rework loops, split and merge, by-products, tooling checks, setup matrices, and digital-twin state ride the routing as governed steps — not tribal knowledge kept in supervisors' heads.

Bin Management

Floor-stock bins with full CRUD: create, move, count, and consume with lot constraints enforced. Line-side inventory stays accurate without freezing production for counts.

Manufacturing sub-modules

subtitle: Plan feasibly, execute completely.

data View: manufacturing:sub-modules

MRP Planning

desc: Material plans from live facts.

link: /sub-modules/mrp-planning

Shop Floor

desc: Work orders with everything attached.

link: /sub-modules/shop-floor

Manufacturing questions

Section 1

Who owns manufacturing truth here versus finance and warehouse?

Manufacturing owns BOM, routing, and work-order execution. Finance owns posting truth; Part 10 owns stock truth. Boundaries are enforced by owner gates, not duplicated records.

Section 2

How are engineering changes absorbed mid-production?

Open orders keep their released snapshots; new orders take the revision. Effectivity dates govern the cutover, and impacted plans replan with the change cited.

Section 3

What about contract manufacturers?

Vendor operations track with the same structure — operations, materials, quality, and costs — with vendor identity and evidence attached to every outside step.

Section 4

Where does OEE come from?

Availability from downtime records, performance from operation times versus standards, quality from check results — all validated events, computed live.

Section 5

Our engineers change designs constantly. Won't versioning drown us?

Effectivity dates do the drowning for you: open orders stay pinned while new orders take the revision. The system absorbs churn that today lives in expediters' heads.

Section 6

Will operators actually use shop-floor terminals?

They already capture time, quantities, and scrap to keep lines moving — the terminal just stops the paper transcription afterward. Barcode validation makes the right scan faster than the wrong one.

Section 7

We just bought an MES. Is it wasted?

Its data migrates with lineage and its integrations map through proof-gated profiles. What the MES did well becomes evidence in the new core instead of sunk cost.

data View

section: faqs

content section

value: An engineering change releases once and propagates everywhere: planning, orders, costing, and delivery commitments update together. MRP replans against real inventory and real capacity the moment the revision lands.

Section 9

Versioned BOMs with effectivity dates, variants, and substitution rules

Section 10

Phantom items, matrix BOMs, and pegged supply for configurable products

Section 11

Capacity-aware MRP with instant replan on engineering change

Section 12

Shop-floor execution with time capture, dependencies, and split/merge

Section 13

Quality checks, scrap, rework, and yield analytics inline

Section 14

Serial and lot genealogy from component to finished unit

Section 15

OEE and downtime tracking feeding BI without batch delay

Section 16

Live cost accumulation into finance on every close

Relationships

products

sub modules