sub-modules

Shop Floor

Paper travelers end here — the order carries everything, the scan proves it.

Paper travelers lie: coffee-stained, outdated, initialed by whoever was nearest. Shop Floor replaces the packet with the order object itself — BOM snapshot, routing, quality checks, labor, and materials in one place, proven by scans at every step. What the operator sees is what engineering released, and what closes is what finance books.

Order lifecycle

Each stage below commits into the same order object — release through close with nothing tracked on the side.

data Viz

data View

section: stages

Release

Orders release with BOM and routing snapshots pinned, materials reserved, and operations sequenced with dependencies. Effectivity governs which revision applies.

Execute

Operations start, report time, consume materials, and record quality results with operator identity. Splits and merges preserve genealogy across resulting units.

Close

Completion posts costs to finance and updates inventory in one transaction. Yield, scrap, and OEE feed BI immediately with the evidence behind every number.

Execution guarantees

Snapshot binding
Released BOM and routing revisions pinned for the order lifetime
Complete capture
Operations, materials, labor, quality, and cost in one object
Unbroken genealogy
Serial and lot lineage preserved across splits, merges, and rework
section
capabilities

Execution by industry

Floor execution bends per industry — same order object, different quality and traceability stakes.

data Viz

data View

section: industries

Automotive and Aerospace

PPAP-linked operations with first-article evidence, SPC checks, and full genealogy for recall scope queries answered in seconds.

Food and Pharma

Batch records with recipe control, in-process checks, and deviation handling. Electronic signatures gate release steps per 21 CFR expectations.

Electronics

SMT lines with reel traceability, test-result linkage per unit, and failure analysis feeding back into process parameters.

Shop Floor questions

Section 1

How is scrap accounted for?

Scrap and rework record against the operation with reason, quantity, and cost impact. Yield analytics update immediately and flow to costing and planning.

Section 2

Can operations run out of sequence?

Only where the routing permits overlap or the supervisor authorizes a governed deviation with reason recorded. Dependencies otherwise gate start until predecessors complete.

Section 3

What about our veteran operators who know the job by heart?

Their knowledge becomes routing data instead of retiring with them. Veterans validate the standards once; every shift after that runs at veteran quality.

data View

section: faqs

content section

value: Completion is a single boundary: operations, materials, labor, quality, and cost commit together or not at all. Split and merge preserve genealogy across every resulting unit.

Section 6

Operation-level tracking with time capture and dependencies

Section 7

Material issue, return, consume, and backflush with genealogy

Section 8

Quality checks, scrap, rework, and yield analytics

Section 9

Serial and lot traceability from component to finished unit

Relationships

products

modules