sub-modules
Physical Feasibility
Test whether the asset, environment, tooling and dependencies can perform the requested work now.
A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.
What changes
A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.
data Viz
data View
section: operating-scene
Operational boundary
- What it does
- Test whether the asset, environment, tooling and dependencies can perform the requested work now.
- What the team gains
- Impossible plans fail before consuming floor time or creating unsafe pressure.
- What it does not own
- Feasibility is not authorization or execution.
- section
- operational-boundary
Physical Feasibility
action: Test whether the asset, environment, tooling and dependencies can perform the requested work now.
mechanism: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.
workflow role: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.
operational outcome: Impossible plans fail before consuming floor time or creating unsafe pressure.
maturity: specified
evidence: MAXACOR Part 5, §§3.3–3.11.
Section 1
Operations team
Section 2
Engineering team
Section 1
Qualified physical state
Section 2
Current work context
Section 1
Evidence-bearing operational disposition
Section 1
Feasibility is not authorization or execution.