sub-modules

Physical Feasibility

Test whether the asset, environment, tooling and dependencies can perform the requested work now.

A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.

What changes

A robot has the payload rating but lacks the charged battery and calibrated tool required for the task. Impossible plans fail before consuming floor time or creating unsafe pressure.

data Viz

data View

section: operating-scene

Operational boundary

What it does
Test whether the asset, environment, tooling and dependencies can perform the requested work now.
What the team gains
Impossible plans fail before consuming floor time or creating unsafe pressure.
What it does not own
Feasibility is not authorization or execution.
section
operational-boundary

Physical Feasibility

action: Test whether the asset, environment, tooling and dependencies can perform the requested work now.

mechanism: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.

workflow role: A robot has the payload rating but lacks the charged battery and calibrated tool required for the task.

operational outcome: Impossible plans fail before consuming floor time or creating unsafe pressure.

maturity: specified

evidence: MAXACOR Part 5, §§3.3–3.11.

Section 1

Operations team

Section 2

Engineering team

Section 1

Qualified physical state

Section 2

Current work context

Section 1

Evidence-bearing operational disposition

Section 1

Feasibility is not authorization or execution.

Relationships

products

modules